Comparative table of the state of the alternative North-South highway



Comparative table of the condition of the North-South highway

Comparative table of the condition of the alternative North-South highway by year

Year Road condition Notes
2015 Start of construction Construction began in 2014. In 2015, work was actively carried out on the Kyzyl-Zhyldyz – Aral section with a length of 12.4 km, which was completed at the end of the 2016 construction season.
2020 Completion of the first and second phases By 2020, work on the first phase (Kyzyl-Zhyldyz – Aral) and the second phase (Aral – Kazarman) was completed. The second phase was 79% complete. The third phase (Kazarman – Jalal-Abad) was scheduled for completion in 2022.
2025 Completion of construction Construction is scheduled to be completed by 2024. In 2025, it is planned to complete the construction of 5 engineering structures, including 3 overpass bridges and 2 avalanche galleries, as well as completion of the construction of 25 km of road.
Кыргызская Республика\ The Kyrgyz Republic г. Бишкек\Bishkek, ул.\str. Логвиненко\Logvinenko 55 (юр.)
Телефон\Phone: +996 312 88 22 82
E-mail\Эл. почта\Эл.дарек: office@nashvek.kg
nash.vek@gmail.com