Comparative table of the condition of the alternative North-South highway by year
| Year | Road condition | Notes |
|---|---|---|
| 2015 | Start of construction | Construction began in 2014. In 2015, work was actively carried out on the Kyzyl-Zhyldyz – Aral section with a length of 12.4 km, which was completed at the end of the 2016 construction season. |
| 2020 | Completion of the first and second phases | By 2020, work on the first phase (Kyzyl-Zhyldyz – Aral) and the second phase (Aral – Kazarman) was completed. The second phase was 79% complete. The third phase (Kazarman – Jalal-Abad) was scheduled for completion in 2022. |
| 2025 | Completion of construction | Construction is scheduled to be completed by 2024. In 2025, it is planned to complete the construction of 5 engineering structures, including 3 overpass bridges and 2 avalanche galleries, as well as completion of the construction of 25 km of road. |