NATIONAL INDEX OF EXTERNAL AID EFFECTIVENESS OF THE KYRGYZ REPUBLIC

NATIONAL INDEX OF EXTERNAL AID EFFECTIVENESS OF THE KYRGYZ REPUBLIC

NIEAE — METHODOLOGY AND MONITORING STANDARD

Methodological Version 1.0 | 2026

Developer: Public Foundation “Nash Vek”

  1. Purpose of the Document

This methodology establishes a unified national standard for measuring the effectiveness of external aid to the Kyrgyz Republic. NIEAE applies to individual projects, programmes, donor portfolios, sectors, regions and the national assistance portfolio.

Key principle: an expert does not select the final score at their own discretion. The expert collects and verifies factual data, while the score is determined by a pre-approved formula, rubric and evidence rules.

  1. Logic of the Index

Document → fact → verification → formula → score → component → NIEAE

Each indicator must have a definition, unit of measurement, source, period, baseline, target, actual value, formula and verification rules. A number from 0–100 is not an expert opinion.

  1. Objectives
  • create a reproducible standard for assessing external assistance;
  • assess results, not only the volume of financing;
  • compare projects, donors, sectors and regions;
  • identify the gap between costs and results;
  • assess the sustainability of results;
  • measure transparency, accountability and citizen participation;
  • produce an annual public analytical product of the Public Foundation “Nash Vek”.
  1. Objects of Assessment
Level Object Purpose
Project Individual project Main monitoring level
Programme Group of interconnected projects Assessment of the overall theory of change
Donor Portfolio of one donor Comparison of portfolio quality
Sector Set of projects in a sector Sectoral analysis
Region Set of projects within a territory Spatial analysis
National portfolio External assistance over a given period NIEAE-N
  1. Assessment Modes
Code Name When to apply
NIEAE-P Implementation Active project; already measurable results are assessed
NIEAE-R Results Completed or sufficiently mature project
NIEAE-N National Aggregation of the external assistance portfolio

An unfinished project must not receive scores for an end result that objectively could not yet have materialized.

  1. Formula

NIEAE = 0.25S + 0.20E + 0.15I + 0.15U + 0.10T + 0.10Ec + 0.05P

Code Component Weight
S Social Results 25%
E Economic Efficiency 20%
I Institutional Results 15%
U Sustainability of Results 15%
T Transparency and Accountability 10%
Ec Environmental Sustainability 10%
P Participation and Inclusion 5%
  1. Unified Calculation Rules

7.1. Type A — an increase in the indicator represents an improvement

Score = min(100; max(0; (Actual − Baseline) / (Target − Baseline) × 100))

7.2. Type B — a decrease in the indicator represents an improvement

Score = min(100; max(0; (Baseline − Actual) / (Baseline − Target) × 100))

7.3. Type C — share of plan completed

Score = min(100; (Actual / Plan) × 100)

7.4. Type D — verification checklist

Score = (Completed criteria / Applicable criteria) × 100

Checklists must contain verifiable “yes/no” conditions or predefined levels. An expert may not assign an arbitrary number between levels.

7.5. Type E — combined indicator

Indicator Score = Σ(Sub-indicator Score × internal weight)

  1. Baseline, Target, Actual and the “No Data ≠ Zero” Rule
  • Baseline — the condition before the intervention or another officially approved reference period.
  • Target — the approved objective of the project/programme.
  • Actual — the value actually achieved during the assessment period.
  • A missing baseline may not be replaced by an arbitrary number.
  • When data are unavailable, status N/D (“not enough data”) is used instead of a zero score.
  • A zero score means a demonstrated absence of a result, while N/D means that the result cannot be reliably measured.
  1. Quality of Evidence
Level Description Coefficient
A — High Independent or primary data confirmed by several sources 1.00
B — Good Data are verifiable, with limited gaps 0.90
C — Limited A substantial part of the data comes from implementer reporting or indirect sources 0.75
D — Weak Evidence is insufficient or substantially contradictory 0.50

Evidence quality is published separately from effectiveness. It shows how reliably the numerical result can be interpreted.

  1. Indicator System

The baseline version of NIEAE contains 32 indicators. Within each component, indicators are equally weighted by default. Additional sector-specific indicators may be added without removing the baseline indicators.

S — Social Results (25%)

Code Indicator What it measures Type
S1 Coverage of Target Groups Share of actual target beneficiaries reached C
S2 Access to Services Change in service availability/coverage A
S3 Change in Well-being Change in income, employment, living conditions or another social outcome A
S4 Inequality and Vulnerability Distribution of results among vulnerable groups and territories E
S5 User Satisfaction Share of users with a confirmed positive assessment of the result A

E — Economic Efficiency (20%)

Code Indicator What it measures Type
E1 Budget Execution Actual expenditure relative to the approved budget C
E2 Compliance with Deadlines Actual duration relative to the approved duration B
E3 Cost per Unit of Result Cost of the actual unit of result relative to the plan/benchmark B
E4 Costs and Results Relationship between costs and achieved results E
E5 Economic Additionality Economic effects and mobilisation of additional resources E

I — Institutional Results (15%)

Code Indicator What it measures Type
I1 Institutional Capacity Change in the responsible institution’s ability to perform its function E
I2 Regulatory and Procedural Changes Adoption and practical application of new rules D
I3 Digitalisation and Process Quality Improvement of processes, data and digital tools E
I4 Human Resources Sustainability Retention of competencies and knowledge E

U — Sustainability of Results (15%)

Code Indicator What it measures Type
U1 Retention of Results Share of results maintained after completion/stage A/E
U2 Operational Financing Availability of confirmed financing for continuation D
U3 Institutionalisation Integration of the result into permanent systems D
U4 Resilience to Risks Availability and effectiveness of measures addressing key risks D/E

T — Transparency and Accountability (10%)

Code Indicator What it measures Type
T1 Public Availability of Financial Information Openness of budgets, expenditures and changes D
T2 Procurement Transparency Openness of procedures, contracts and amendments D
T3 Results Reporting Timeliness and completeness of reporting D
T4 Complaints and Response Availability of a complaints mechanism and demonstrable response D

Ec — Environmental Sustainability (10%)

Code Indicator What it measures Type
Ec1 Environmental Risks and Requirements Existence and quality of environmental assessment and risk management D
Ec2 Impact Reduction Actual prevention/minimisation of impacts E
Ec3 Climate Resilience Consideration of climate risks E
Ec4 Resource Efficiency Energy efficiency, resource use and waste management, where applicable E

P — Participation and Inclusion (5%)

Code Indicator What it measures Type
P1 Public Consultations Timeliness, coverage and substance of consultations D
P2 Civil Society Participation Actual involvement of NGOs and independent experts D
P3 Consideration of Affected Groups’ Views Evidence that feedback was taken into account D
P4 Accessibility of Information Clarity, timeliness and accessibility of information D
  1. Indicator Passport
Field Required Content
Code and name Unique code and wording
Definition What exactly is measured
Unit %, people, som, days, km, etc.
Type A/B/C/D/E
Baseline Value, date, source
Target Target, date, source
Actual Actual value, date, source
Formula Exact formula/checklist
Verification Who and how confirmed
Score Automatically calculated score
Quality A/B/C/D
Comment Limitations and special conditions
  1. Source Hierarchy
Priority Source Examples
1 Independent/primary data Audit, official statistics, independent surveys, measurements
2 Official project data Contracts, registers, reports, completion reports
3 Implementer data Progress reports, internal monitoring
4 Independent secondary sources Academic research, NGOs, media with verifiable data
5 Unverified statements Cannot be the sole basis for a score
  1. Step-by-Step Monitoring Process
  1. Define the object, period and assessment mode.
  2. Register the project and collect the basic document package.
  3. For each indicator, determine the baseline, target, actual value or applicable checklist.
  4. Record sources and dates.
  5. Check completeness and consistency.
  6. Calculate each indicator score using the approved formula.
  7. Calculate components S, E, I, U, T, Ec and P.
  8. Conduct independent verification of a sample and disputed values.
  9. Determine the quality and completeness of evidence.
  10. Automatically calculate the final NIEAE.
  11. Prepare analytical findings and recommendations.
  12. Publish the result together with the methodology, sources and limitations.
  13. When new evidence appears, recalculate the indicator while retaining the history of changes.
  1. Separation of Roles
Role Function Not permitted
Monitor Data collection and primary verification Arbitrarily change the final score
Verifier Verification of sources and calculations Replace data without recording the basis
Methodologist Control consistent application of rules Change rules for an individual project
Analyst Interpretation of results Change a numerical result without recalculation
Assessment Lead Approval of publication Approve unverified facts
  1. Resolution of Discrepancies
  • All materially different values are recorded.
  • Priority is given to the more reliable and verifiable source according to the established hierarchy.
  • Where reliability is equal, a range/explanation is published, and the final choice is made according to a pre-approved rule.
  • Any change to a published value receives a date, justification and a new source reference.
  1. Component Calculation

C = Σ(Scoreᵢ × wᵢ)

The sum of the internal indicator weights within a component equals 100%. By default, all indicators are equally weighted. Changes to internal weights are possible only through a separate methodological decision published before application to a new sample.

  1. Data Coverage Rule

For full publication of a component, usable data are recommended for at least 75% of applicable indicators. If coverage is below 75%, the component is published with the label “limited measurability.” Missing data are not converted into zero.

  1. National Index

For NIEAE-N, it is recommended to publish two values simultaneously: an equally weighted index and a financially weighted index. The first shows the typical project result; the second shows portfolio effectiveness taking financial scale into account.

Indicator Method
NIEAE-N equally weighted Average of project NIEAE scores
NIEAE-N financially weighted Weighted by financing volume
  1. Interpretation
Score Category Meaning
90–100 Very High Results fully/significantly exceed targets; evidence and sustainability are strong
75–89 High Main results achieved; limitations are limited
60–74 Adequate Main results achieved, but significant gaps remain
40–59 Low Results partially achieved; significant problems
0–39 Critically Low Results not achieved or the evidence base shows serious problems
  1. Project Profile
Indicator Result
S — Social Results __/100
E — Economic Efficiency __/100
I — Institutional Results __/100
U — Sustainability __/100
T — Transparency and Accountability __/100
Ec — Environmental Sustainability __/100
P — Participation and Inclusion __/100
NIEAE __/100
Evidence Quality A/B/C/D
Data Completeness __%
  1. Red Flags
  • confirmed material violations of environmental or social requirements;
  • materially non-transparent financial data;
  • systemic procurement problems;
  • unresolved material complaints;
  • absence of mandatory reporting;
  • a significant gap between the reported and verified result.

A red flag is published separately from the final score so that a high average result does not conceal a material problem.

  1. Calculation Example

A project must increase access to a service from 45% to 70%. The actual value is 65%.

(65 − 45) / (70 − 45) × 100 = 80

The indicator receives 80 points. The expert does not choose 80; the number results from the data and the pre-established formula.

  1. Inter-Rater Reproducibility

Before the official launch, two independent assessors must assess the same sample of projects using the same version of the methodology. Differences are analysed by cause: data, source or application of the rule. The methodology is changed only systematically, not in order to achieve a desired result.

  1. Piloting
  • Pilot sample: 15–30 projects from different donors, sectors, sizes and stages.
  • At least two independent assessors.
  • Record all disputed cases.
  • Test formulas and rubrics before official approval.
  • After approval, changes are issued as a new version of the methodology.
  1. Project Card
Field Content
Project Official name
Donor Funding organisation
Implementer Responsible authority
Sector/region Classification
Financing Amount and currency
Period/stage Start, end, stage
S/E/I/U/T/Ec/P Component scores
NIEAE Final score
Evidence quality A/B/C/D
Data completeness %
Strengths Actual results
Problems Confirmed problems
Recommendations Corrective measures
Version/date Methodology version and assessment date
  1. Minimum Audit Trail

Indicator → value → unit → source → date → verification → formula → score

Field Example
Code S1
Actual 82,000
Plan 100,000
Source Report/register, date
Formula 82,000 / 100,000 × 100
Score 82
Verification Name/code and date
  1. Methodology Governance
  • The methodology has a version number and effective date.
  • All changes are documented in a change log.
  • A new formula is not applied covertly to previously published data.
  • Where a retrospective recalculation is performed, both the original and recalculated values are published.
  • It is recommended to establish an independent methodological group involving civil society, academia and relevant specialists.
  1. Public Disclosure
  • Not only the final score but also the component profile is published.
  • Indicators, sources, evidence quality and completeness are published.
  • Limitations and disputed cases are published.
  • The methodology version and calculation date are published.
  • The history of revisions is retained.

Appendix 1. Monitoring Sheet

Code Indicator Baseline Target Actual Source Score Comment
S1 Coverage of Target Groups
S2 Access to Services
S3 Change in Well-being
S4 Inequality and Vulnerability
S5 User Satisfaction
E1 Budget Execution
E2 Compliance with Deadlines
E3 Cost per Unit of Result
E4 Costs and Results
E5 Economic Additionality
I1 Institutional Capacity
I2 Regulatory and Procedural Changes
I3 Digitalisation and Process Quality
I4 Human Resources Sustainability
U1 Retention of Results
U2 Operational Financing
U3 Institutionalisation
U4 Resilience to Risks
T1 Public Availability of Financial Information
T2 Procurement Transparency
T3 Results Reporting
T4 Complaints and Response
Ec1 Environmental Risks and Requirements
Ec2 Impact Reduction
Ec3 Climate Resilience
Ec4 Resource Efficiency
P1 Public Consultations
P2 Civil Society Participation
P3 Consideration of Affected Groups’ Views
P4 Accessibility of Information

Appendix 2. Source Verification Form

Field Entry
Indicator ____________________________
Source ____________________________
Document/link ____________________________
Publication date ____________________________
Access date ____________________________
Actual value ____________________________
Verification method ____________________________
Verifier ____________________________
Status Verified / Partially verified / Unverified
Quality A / B / C / D

Appendix 3. Data Statuses

Status Meaning
Verified Checked and confirmed
Partially verified Partially checked
Unverified Not independently confirmed
N/A Not applicable
N/D Not enough data

Appendix 4. Structure of the Annual Report

  1. Executive Summary.
  2. Methodology and version changes.
  3. National NIEAE.
  4. NIEAE by donors.
  5. NIEAE by sectors.
  6. NIEAE by regions.
  7. Transparency and accountability.
  8. Citizen participation.
  9. Most effective and problematic projects.
  10. Red flags and systemic problems.
  11. Recommendations.
  12. Full dataset of indicators and sources.
  1. Final Provision

NIEAE is intended to move from assessing external assistance by the volume of financing attracted to assessing actual results, their cost, sustainability, transparency and public accountability. The main quality criterion of NIEAE is reproducibility: an independent specialist with access to the current methodology and published sources must be able to repeat the calculation and obtain the same result.

Before the first official national calculation, the methodology must be piloted on a sample of projects from 2023–2025. Until the pilot is completed, results should be labelled as pilot results. After approval of Version 1.0, changes may be introduced only through a new version of the methodology.