  1. PURPOSE AND SCOPE
    1.1. Purpose of Monitoring
    1.2. Objectives of Monitoring
  2. KEY CONCEPTS
  3. PRINCIPLES OF MONITORING
  4. OBJECT AND SCOPE OF MONITORING
  5. MONITORING CYCLE
  6. PROJECT SELECTION AND INITIAL ASSESSMENT
  7. DESK RESEARCH
  8. MONITORING INDICATORS AND ASSESSMENT
  9. MONITORING IMPACTS ON PEOPLE
  10. MONITORING NEGATIVE IMPACTS
  11. NEGATIVE IMPACT CARD
  12. WORKING WITH AFFECTED AND POTENTIALLY AFFECTED PERSONS
  13. FIELD MONITORING
  14. WORKING WITH COMMUNITIES
  15. REVIEW AND VERIFICATION OF EVIDENCE
  16. ANALYSIS OF CAUSES AND CONSEQUENCES
  17. RESPONSE AND RECOMMENDATIONS
  18. POST-PROJECT MONITORING
  19. PREPARATION OF MONITORING RESULTS
  20. PERSONAL DATA PROTECTION
  21. MINIMUM MONITORING PACKAGE

ANNEXES

Annex 1. Project Card
Annex 2. Field Monitoring Checklist
Annex 3. Affected / Potentially Affected Person Card
Annex 4. Negative Impact / Incident Card
Annex 5. Evidence Matrix
Annex 6. Interview Template
Annex 7. Monthly Monitoring Self-Report
Annex 8. Analytical Report Template

  1. PURPOSE AND SCOPE

This Methodology establishes a common approach to monitoring External Aid provided to the Kyrgyz Republic and implemented through projects and programmes financed by international financial institutions, bilateral and multilateral donors, development agencies, governments and other external sources.

The Methodology is intended for civil society organisations, independent monitors, researchers, experts and other actors involved in monitoring External Aid and its impact on people, communities and the environment.

The Methodology may be applied to projects at different stages of implementation, including projects under preparation, ongoing projects, completed projects and, where necessary, projects that have been formally closed but whose impacts or unresolved issues continue.

The Methodology is based on the principles of independence, transparency, accountability, evidence-based monitoring, participation and protection of the rights and legitimate interests of people and communities.

1.1. Purpose of Monitoring

The purpose of monitoring is to obtain, verify and analyse reliable information on the planning, financing, implementation and results of External Aid projects, including their social, economic and environmental impacts.

Monitoring seeks to determine:

  • whether the project is implemented in accordance with its stated objectives and commitments;
  • whether information on the project is accessible and sufficiently transparent;
  • whether affected and potentially affected people and communities are properly identified and informed;
  • whether project-related impacts on people, property, livelihoods, access and the environment are properly assessed and addressed;
  • whether commitments made by project implementing agencies, donors and financiers are fulfilled;
  • whether complaints and concerns raised by affected people are appropriately considered;
  • whether identified problems receive an appropriate response and remedy.

Monitoring does not replace the functions of government authorities, project implementing agencies, financiers, auditors, courts or other competent institutions.

1.2. Objectives of Monitoring

The main objectives are to:

  • collect and systematise information about External Aid projects;
  • assess the transparency and accountability of project implementation;
  • identify potential risks and negative impacts;
  • document actual or potential impacts on people and the environment;
  • identify affected and potentially affected persons and communities;
  • verify information using available documentary, visual and other evidence;
  • analyse the causes and consequences of identified problems;
  • identify gaps in project planning, implementation, monitoring or disclosure;
  • prepare evidence-based recommendations;
  • support constructive engagement with relevant institutions;
  • monitor whether identified problems and impacts are subsequently addressed.

  1. KEY CONCEPTS

External Aid — financial, technical, material or other development assistance provided to the Kyrgyz Republic or to projects and programmes from external sources, including international financial institutions, bilateral and multilateral donors, development agencies and governments.

Project — a specific investment, infrastructure, development, technical assistance or other activity financed or supported through External Aid.

Monitoring — systematic collection, verification, analysis and documentation of information concerning a project and its implementation.

Affected Person — an individual whose rights, property, livelihood, access, living conditions or other legitimate interests have been directly affected by a project.

Potentially Affected Person — an individual who may be affected by a project or whose circumstances indicate a reasonable possibility of project-related impact, even where the impact has not yet been fully established.

Affected Community — a group of people whose living conditions, environment, access, livelihoods or other legitimate interests may be affected by a project.

Negative Impact — an adverse consequence of a project that affects people, property, livelihoods, access, communities or the environment.

Incident — a specific event or circumstance associated with a project that has caused or may cause negative impacts.

Evidence — documents, photographs, videos, maps, correspondence, official records, interviews, observations, publicly available information and other materials that can support or verify a finding.

Verification — the process of checking the reliability, consistency and relevance of information and evidence.

Grievance Mechanism — a formal or informal mechanism through which individuals or communities may submit complaints, concerns or requests regarding a project.

Project Cycle — the stages through which a project passes, including preparation, approval, implementation, completion and post-completion stages.

Monitoring Indicator — a measurable or otherwise verifiable criterion used to assess a project or a specific aspect of its implementation.

  1. PRINCIPLES OF MONITORING

Monitoring shall be based on the following principles:

Independence. Monitoring should be conducted independently of project implementing agencies and other entities whose activities are being assessed.

Objectivity. Findings should be based on available evidence and should distinguish verified facts from statements, assumptions and preliminary observations.

Evidence-based approach. Conclusions should be supported by documents, observations, testimony or other relevant evidence.

Transparency. Monitoring methods and findings should be presented clearly, while respecting confidentiality and personal data protection.

Do no harm. Monitoring activities should not expose affected persons or communities to additional risks.

Participation. Where appropriate, people and communities should have an opportunity to provide information, express concerns and clarify facts.

Protection of personal data. Personal information shall be collected and used only to the extent necessary for monitoring and in accordance with applicable requirements.

Non-discrimination. Monitoring shall consider the circumstances of different groups and shall not discriminate on any grounds.

Accountability. Monitoring should identify responsible institutions where responsibility can reasonably be established on the basis of evidence.

Follow-up. Significant findings should, where possible, be followed up to determine whether identified problems have been addressed.

  1. OBJECT AND SCOPE OF MONITORING

The object of monitoring may include:

  • External Aid projects and programmes;
  • project financing and procurement;
  • project implementation arrangements;
  • infrastructure and construction activities;
  • resettlement and compensation processes;
  • land acquisition and property impacts;
  • access to property, roads and services;
  • impacts on livelihoods;
  • social and environmental safeguards;
  • public participation and information disclosure;
  • grievance mechanisms;
  • project monitoring and reporting;
  • project completion and post-project impacts.

The scope of monitoring shall be determined according to the nature, scale, potential risks and stage of the project.

  1. MONITORING CYCLE

Monitoring generally consists of the following stages:

  1. project identification and selection;
  2. preliminary assessment;
  3. desk research;
  4. identification of monitoring indicators;
  5. identification of potentially affected people and communities;
  6. collection and verification of evidence;
  7. field monitoring, where necessary;
  8. analysis of causes and consequences;
  9. preparation of findings and recommendations;
  10. communication of findings to relevant institutions;
  11. follow-up monitoring.

The stages may be combined, repeated or adapted depending on the circumstances of a particular project.

  1. PROJECT SELECTION AND INITIAL ASSESSMENT

Projects may be selected for monitoring based on:

  • financial scale;
  • social or environmental significance;
  • geographic coverage;
  • number of potentially affected people;
  • infrastructure or land-use impacts;
  • public importance;
  • complaints or reports received;
  • identified transparency or accountability risks;
  • evidence of possible non-compliance;
  • information obtained through previous monitoring;
  • requests from affected persons or communities.

The initial assessment should identify the project’s basic characteristics, financing source, implementing institution, location, current status, potential risks and available information.

Projects with significant potential impacts on people or the environment may receive increased monitoring attention.

  1. DESK RESEARCH

Desk research is the initial collection and analysis of information without direct field visits.

Sources may include:

  • project documents;
  • financing agreements;
  • project websites;
  • donor and financier databases;
  • procurement information;
  • environmental and social documents;
  • resettlement documents;
  • monitoring reports;
  • audit reports;
  • government documents;
  • official correspondence;
  • court decisions;
  • publicly available maps and satellite imagery;
  • media reports;
  • information provided by affected people and communities.

The monitor should record the source and date of important information and distinguish original documents from secondary sources.

  1. MONITORING INDICATORS AND ASSESSMENT

Monitoring indicators should be selected according to the project and its potential impacts.

The assessment may cover:

  • transparency;
  • accountability;
  • participation;
  • implementation;
  • economic and financial aspects;
  • social impacts;
  • environmental impacts;
  • compliance with stated commitments;
  • access to information;
  • grievance handling;
  • protection of affected persons;
  • project outcomes.

Where appropriate, the following scoring formula may be used:

Score = 0.25S + 0.20E + 0.15I + 0.15U + 0.10T + 0.10Ec + 0.05P

where:

  • S — social impact;
  • E — environmental impact;
  • I — implementation;
  • U — public participation and access to information;
  • T — transparency;
  • Ec — economic and financial aspects;
  • P — protection of affected persons.

The scoring system is an analytical tool and does not replace qualitative assessment or documented evidence.

  1. MONITORING IMPACTS ON PEOPLE

Monitoring shall consider whether a project has affected or may affect:

  • ownership or use of land;
  • houses and other structures;
  • access to property;
  • roads and pedestrian access;
  • utilities and public services;
  • livelihoods and income-generating activities;
  • agricultural land;
  • business activities;
  • safety;
  • living conditions;
  • community infrastructure;
  • cultural or social resources.

Particular attention should be given to persons who may have been omitted from official lists, assessments, consultations, compensation processes or monitoring activities.

Where an individual or community reports an impact, the monitor should document the report without automatically treating it as a verified fact. Verification should be undertaken using available evidence.

  1. MONITORING NEGATIVE IMPACTS

Negative impacts may concern:

People and property

  • damage to houses, structures or other property;
  • loss or restriction of land use;
  • loss of access;
  • displacement;
  • loss of livelihood;
  • damage to infrastructure or utilities;
  • safety risks.

Communities

  • disruption of normal movement;
  • reduced access to services;
  • changes in community infrastructure;
  • conflicts or social tensions;
  • impacts on vulnerable groups.

Environment

  • water pollution or changes in drainage;
  • soil degradation;
  • air pollution and dust;
  • noise and vibration;
  • destruction of vegetation;
  • erosion;
  • waste;
  • changes to natural water flows;
  • other environmental damage.

Negative impacts should be documented as specifically as possible, including location, date or period, affected persons or groups, nature of the impact, available evidence and potential causes.

  1. NEGATIVE IMPACT CARD

Each significant case may be documented using the Negative Impact / Incident Card provided in Annex 4.

The card should contain, where available:

  • project name;
  • location;
  • date or period;
  • description of the impact;
  • persons or communities affected;
  • type of impact;
  • evidence available;
  • source of information;
  • preliminary assessment;
  • possible project-related cause;
  • measures already taken;
  • unresolved issues;
  • recommended follow-up.

The card should be updated when new evidence becomes available.

  1. WORKING WITH AFFECTED AND POTENTIALLY AFFECTED PERSONS

Communication with affected and potentially affected persons should be conducted respectfully and without creating additional risks.

The monitor should:

  • explain the purpose of the monitoring;
  • explain how information may be used;
  • obtain consent where appropriate;
  • avoid collecting unnecessary personal information;
  • allow the person to decide what information they wish to provide;
  • avoid pressuring a person to participate;
  • accurately record the person’s statements;
  • distinguish statements from independently verified facts;
  • protect confidential information where requested.

The monitor should not promise compensation, legal outcomes or other results that are outside the monitor’s authority.

Where a person has documentary evidence, the monitor may request copies or permission to review the documents.

  1. FIELD MONITORING

Field monitoring is conducted when direct observation is necessary to verify information or assess actual conditions.

Before a field visit, the monitor should review available documents and prepare a field checklist.

During the visit, the monitor may:

  • inspect the project site;
  • document physical conditions;
  • take photographs or videos where appropriate;
  • identify relevant locations;
  • speak with affected or potentially affected persons;
  • compare actual conditions with project documents;
  • identify discrepancies;
  • collect available documentary evidence.

Field observations should include the date and location whenever possible.

Photographs and other visual evidence should be appropriately identified and linked to the relevant monitoring case.

  1. WORKING WITH COMMUNITIES

Community engagement should be conducted in a manner appropriate to the local context.

Where necessary, monitoring may include:

  • community meetings;
  • individual interviews;
  • focus group discussions;
  • site visits;
  • collection of written statements;
  • review of community concerns and complaints.

The monitor should avoid creating expectations that monitoring itself will automatically result in compensation or other remedies.

Where several people report similar circumstances, the information may be analysed collectively while protecting personal data.

  1. REVIEW AND VERIFICATION OF EVIDENCE

Evidence should be assessed according to:

  • source;
  • date;
  • relevance;
  • consistency;
  • authenticity where it can reasonably be established;
  • relationship to the project;
  • ability to corroborate other information.

Where possible, important findings should be supported by more than one source.

Evidence may be classified as:

Confirmed — sufficiently supported by reliable evidence.

Partially confirmed — supported by some evidence but requiring additional verification.

Unconfirmed — reported or observed information for which sufficient evidence has not yet been obtained.

Contradicted — information that conflicts with reliable evidence.

The monitor should not alter or selectively present evidence in a way that creates a misleading impression.

  1. ANALYSIS OF CAUSES AND CONSEQUENCES

For significant findings, the monitor should analyse:

  • what happened;
  • when and where it happened;
  • who was affected;
  • what project activity was associated with the impact;
  • what evidence supports the connection;
  • whether the impact was foreseeable;
  • whether relevant assessments or consultations were conducted;
  • whether preventive measures existed;
  • whether complaints were submitted;
  • how responsible institutions responded;
  • what consequences resulted;
  • whether the consequences remain unresolved.

Causal conclusions should be proportionate to the available evidence.

Where causation cannot be established, the report should clearly state that the relationship remains unverified or requires further investigation.

  1. RESPONSE AND RECOMMENDATIONS

Recommendations should be specific, realistic and linked to documented findings.

Depending on the circumstances, recommendations may concern:

  • correction of identified deficiencies;
  • restoration of access;
  • assessment of damage;
  • review of project records;
  • additional consultation;
  • disclosure of information;
  • improvement of grievance handling;
  • restoration or mitigation measures;
  • compensation or other appropriate remedy where legally and factually justified;
  • institutional measures to prevent recurrence.

Recommendations should identify, where possible, the institution responsible for taking action.

Monitoring should not impose additional unnecessary burdens on affected persons where relevant circumstances can reasonably be established through existing documents, project records, official information, field observations or other available evidence.

  1. POST-PROJECT MONITORING

Completion or formal closure of a project does not necessarily mean that all project-related impacts have ended.

Post-project monitoring may be conducted where:

  • negative impacts remain unresolved;
  • complaints remain pending;
  • affected persons have not received an appropriate response;
  • infrastructure continues to cause documented problems;
  • environmental impacts continue;
  • project commitments remain incomplete;
  • information obtained after project closure indicates unresolved issues.

Post-project monitoring should focus on the current status of previously identified issues and whether appropriate measures have been taken.

  1. PREPARATION OF MONITORING RESULTS

Monitoring results may be presented as:

  • monitoring notes;
  • case studies;
  • project profiles;
  • analytical reports;
  • thematic reports;
  • public statements;
  • submissions to responsible institutions;
  • complaints or requests for review.

A monitoring report should distinguish:

  • verified facts;
  • information provided by individuals or institutions;
  • observations;
  • analysis;
  • conclusions;
  • recommendations.

Where information is incomplete, this should be stated clearly.

  1. PERSONAL DATA PROTECTION

Personal data should be collected only when necessary for monitoring purposes.

The monitor should:

  • minimise the amount of personal information collected;
  • explain the purpose of collecting information;
  • store information securely;
  • restrict access to authorised persons;
  • avoid unnecessary publication of identifying information;
  • anonymise information in public reports where appropriate;
  • respect requests for confidentiality where feasible and appropriate.

Personal information should not be included in public materials unless there is an appropriate basis for doing so.

Information concerning affected persons should be handled in a manner that does not expose them to retaliation, discrimination or other risks.

  1. MINIMUM MONITORING PACKAGE

The minimum monitoring package should normally include:

  1. Project Card;
  2. available key project documents;
  3. monitoring indicators;
  4. Field Monitoring Checklist, where applicable;
  5. affected / potentially affected person information, where applicable;
  6. Negative Impact / Incident Card, where applicable;
  7. evidence and supporting materials;
  8. interview records, where applicable;
  9. Evidence Matrix;
  10. monitoring findings and recommendations;
  11. follow-up information, where applicable.

The package may be expanded depending on the nature and complexity of the project.

ANNEX 1. PROJECT CARD

Field Information
Project name
Project number
Country / location
Financing institution / donor
Implementing agency
Project cost
External Aid amount
Financing instrument
Approval date
Implementation period
Current status
Project objectives
Main components
Potentially affected areas
Potential social impacts
Potential environmental impacts
Main risks
Complaints / concerns identified
Available documents
Sources of information
Monitoring priority / rationale
Date of monitoring
Monitor

ANNEX 2. FIELD MONITORING CHECKLIST

2.1. General Information

Question / Indicator Findings / Evidence
Project name and number
Location
Date of visit
Persons participating in the visit
Weather / site conditions, where relevant
Current project status
Main activities observed
Differences from project documentation

2.2. People, Property and Access

Question / Indicator Findings / Evidence
Are residential properties affected?
Are other structures affected?
Is land affected?
Has access to property changed?
Is pedestrian access available?
Is vehicle access available?
Are roads or entrances blocked?
Are utilities affected?
Are livelihoods affected?
Are affected persons included in project records?
Were consultations conducted?
Were compensation or other measures provided?
Are unresolved issues reported?

2.3. Environment

Question / Indicator Findings / Evidence
Is there visible environmental damage?
Is water affected?
Have drainage or water flows changed?
Is soil affected?
Is there dust or air pollution?
Is there excessive noise or vibration?
Has vegetation been removed or damaged?
Is there erosion?
Is waste properly managed?
Are there other environmental concerns?

2.4. Evidence

Evidence Type Available / Not Available Description / Reference
Photographs
Video
Official documents
Maps / satellite imagery
Interviews
Written statements
Correspondence
Project records
Other evidence

ANNEX 3. AFFECTED / POTENTIALLY AFFECTED PERSON CARD

Field Information
Case number
Project
Date
Name / identifier*
Contact information*
Location
Type of affected status Affected / Potentially affected
Property / land involved
Description of impact
Date / period of impact
Project activity associated with impact
Documents available
Other evidence
Complaint submitted Yes / No
Institution contacted
Response received
Current status
Follow-up required

Personal information should be collected only where necessary and should be protected in accordance with applicable requirements.

ANNEX 4. NEGATIVE IMPACT / INCIDENT CARD

Field Information
Case number
Project
Date identified
Location
Date / period of incident
Type of impact People / Property / Community / Environment / Other
Description
Affected persons / community
Project activity involved
Immediate consequences
Long-term or continuing consequences
Evidence available
Source(s)
Verification status Confirmed / Partially confirmed / Unconfirmed / Contradicted
Possible cause
Institution(s) involved
Complaint / request submitted
Response received
Measures taken
Unresolved issues
Recommended action
Follow-up date
Responsible monitor

ANNEX 5. EVIDENCE MATRIX

No. Finding / Issue Source Date Type of Evidence Reliability / Verification Link to Project Notes
1
2
3
4
5

ANNEX 6. INTERVIEW TEMPLATE

6.1. General Information

Field Information
Interview number
Date
Location / format
Interviewer
Interviewee identifier
Relationship to project
Consent to participate
Confidentiality requested Yes / No

6.2. Main Questions

Question Response / Notes
What is your connection to the project or affected area?
What happened?
When did it happen?
Where did it happen?
Who was affected?
What impact did you experience or observe?
Did you report the issue to any institution?
What response did you receive?
Do you have documents or other evidence?
Are there other people who can confirm the information?
What remains unresolved?
What action do you consider necessary?

6.3. Materials Received During the Interview

Material Description Copy / Original Reference

ANNEX 7. MONTHLY MONITORING SELF-REPORT

7.1. Work Completed

Activity Project / Case Date Result / Output

7.2. Problems Identified

Problem Project / Case Evidence Current Status

7.3. Next Steps

Planned Action Project / Case Responsible Person Planned Date

ANNEX 8. ANALYTICAL REPORT TEMPLATE

  1. Executive Summary

Briefly describe the project, the main monitoring findings, significant impacts, key evidence and principal recommendations.

  1. Project Background

Provide information on the project, financing, implementing institutions, location, objectives and implementation period.

  1. Monitoring Purpose and Scope

Describe why the project was selected and what aspects were monitored.

  1. Methodology

Describe the methods used, including desk research, field monitoring, interviews, document review, analysis of visual evidence and other methods.

  1. Project Implementation

Describe the actual implementation of the project and any significant differences identified between planned and actual implementation.

  1. Impacts on People and Communities

Describe identified or potential impacts on people, property, livelihoods, access, services and communities.

  1. Environmental Impacts

Describe identified or potential environmental impacts.

  1. Negative Impacts and Incidents

Present significant cases using the Negative Impact / Incident Cards and explain their current status.

  1. Evidence and Verification

Present the main evidence supporting the findings and explain the verification process.

  1. Analysis of Causes and Consequences

Analyse the causes, contributing factors and consequences of identified problems, distinguishing verified facts from assumptions or unresolved questions.

  1. Conclusions and Recommendations

Present evidence-based conclusions and specific recommendations addressed to relevant institutions.

  1. Follow-up Monitoring

Specify which issues require further monitoring, what actions should be followed up and, where possible, the institution responsible and proposed timeframe.

End of Methodology

Кыргыз Республикасы\ The Kyrgyz Republic Бишкек\Bishkek, ул.\str. Логвиненко\Logvinenko 55 (юр.)
Телефон\Phone: +996 312 88 22 82
E-mail\Эл. почта\Эл.дарек: office@nashvek.kg
nash.vek@gmail.com